Trying to re-dig a water-logged, clay sludge, filled pond with my old 977H. Trying to back up the slope with anything more than an empty bucket leaves me spinning in the dirt. Grade is pretty steep and I'm not doing very well at lessening it. Keep digging in, can't quite get the technique down. Ground I'm driving on is dry clay.
Thinking of finding a set of bulldozer tracks, or maybe borrowing a big welder and adding some serious grouser bars to the tracks.
Anyone wish to share experience or thoughts?
Thinking of finding a set of bulldozer tracks, or maybe borrowing a big welder and adding some serious grouser bars to the tracks.
Anyone wish to share experience or thoughts?